Wolfratshausen, DE

Object:
Cable stayed bridge
Client:
City of Wolfratshausen
Ingenieur:
Ingenieurbüro Robert Buxbaum, Wolfratshausen
Completition:
Schaffitzel Holzindustrie
Year of construction:
2013

Technical data

Construciton:
Main structure consisting of blocklaminated main carrier with a mastic asphalt applied on a rear-ventilated BFU-plate including sealing. The cladding consists of a horizontal, ventilated weather boarding of planed larch planks in visual quality. Exposed parts as pylon or railing made of steel.
Dimensions:
47 x 3 m
Our role:
Work planning, project management and execution

Special features

The very filigree primary beam is protected by a weatherboarding and is fixed by two bracings to an A-pylon. For the flooring was a mastic asphalt selected. The filler rod railing is made of flat bar, so it is very inconspicuous. The LED-fluorescent strips at the handrail light the bridge in the night.