Aggerbogen, DE
- Object:
- Cable stayed bridge crossing the Agger
- Client:
- City of Lohmar
- Construction:
- Ingenieurbüro Miebach
- Structural analysis:
- Schaffitzel Holzindustrie
- Completition:
- Schaffitzel Holzindustrie
- Year of construciton:
- 2013
Technical data
- Construction:
- Laminated block beam with a decking of natural stones, encased with larch at the sides, steel railing and Accoya-handrail.
- Dimensions:
- 62,32 x 2,00 m
- Our role:
- Work planning, project management and execution
Special features
The S-shaped trend of the bridge has a maximum of height gain during a margianal build-up. Another point for the choice of the S-shaped trend is the affinity to the form of the crossed part of the Agger. For such a form and span are steel bracings necessary, which are connected per shore side to one pin pylon. They are olive-green, so the colour match to the natural environment. The filled rod railing is also olive-green and has a handrail out of especially permanent Accoya gluelam. The granite slabs do not need, due to the high dead load, any deposit insurance, therefor a delayed take off without any damages is possible.