Aggerbogen, DE

Object:
Cable stayed bridge crossing the Agger
Client:
City of Lohmar
Construction:
Ingenieurbüro Miebach
Structural analysis:
Schaffitzel Holzindustrie
Completition:
Schaffitzel Holzindustrie
Year of construciton:
2013

Technical data

Construction:
Laminated block beam with a decking of natural stones, encased with larch at the sides, steel railing and Accoya-handrail.
Dimensions:
62,32 x 2,00 m
Our role:
Work planning, project management and execution

Special features

The S-shaped trend of the bridge has a maximum of height gain during a margianal build-up. Another point for the choice of the S-shaped trend is the affinity to the form of the crossed part of the Agger. For such a form and span are steel bracings necessary, which are connected per shore side to one pin pylon. They are olive-green, so the colour match to the natural environment. The filled rod railing is also olive-green and has a handrail out of especially permanent Accoya gluelam. The granite slabs do not need, due to the high dead load, any deposit insurance, therefor a delayed take off without any damages is possible.